A Step-by-Step Kitchen Remodeling Timeline
A kitchen remodel can take anywhere from a couple of months to a year or more depending on the size of the project. The steps of a kitchen remodel are similar for many projects, but can vary based on the scale of the renovation.
We believe following these steps will guide you through a successful kitchen renovation. Some remodelers may experience a few hiccups along the way, but with a plan in place, a beautiful kitchen renovation is possible!
Before Starting a Project
Big choices, like deciding to hire a contractor or doing it yourself, need to be made before starting a project.
Dream and Set Realistic Goals
Begin by envisioning your end-goal, your dream. Gather photos and design inspiration. Will you replace cabinets, countertops, flooring and appliances? Add a second sink or upgrade to a decorative range hood? Move a wall? Dream big, and then ask yourself what is a must-have and what is nice-to-have
Create a Budget
Regardless of the total dollar amount, it’s important to create a budget. Learn what costs to expect and how to set your budget.
Keep your budget flexible by setting aside 10 to 20 percent for unplanned expenses.
Research and Hire a Contractor
If you’re hiring a general contractor, do your research and set aside time to interview at least three. Start this process early because qualified contractors are often booked 4 to 8 months out.
Phase 1: Planning Your Kitchen Remodel
Planning your kitchen remodel is the foundation for a successful project. It can take anywhere from a few weeks to a few months, depending on when you plan to remodel your kitchen.
Order Cabinet Samples
Selecting a cabinet door style and color sets the tone of your kitchen. It also helps you choose countertops, flooring and more. Ordering samples early in the process will give you plenty of time to decide on a favorite.
Apply for Building Permits
A building permit is often required for structural, plumbing, mechanical, and electrical alterations to a house. If you have a contractor, he or she should take care of permitting. This process can take weeks or months depending on the complexity of the project and the municipality, so apply early.
Measure Your Space
Taking a few simple measurements of your space is all that’s needed to start a free kitchen design. If you’re working with a contractor, they can help collect detailed measurements. We also offer in-home measurement services.
Talk With a Kitchen Designer
Talking with a kitchen designer will help you translate your ideas and inspiration into a beautiful and functional kitchen. After discussing your wants, needs and budget, your designer will create an initial design which you can revise together until it matches your vision and goals.
Finalize Your Plans
Finalize your kitchen design, timeline plans and contracts. Create your own scope of work detailing who is responsible for each part of the project. Set a date for when the work should be completed. This will help avoid delays and miscommunication.
Phase 2: Order Your Products (1-2 months)
Shopping for and ordering your products can take several months.
It is best to wait for all your materials to arrive before demolishing any part of your kitchen.
Order Appliances
As you choose appliances, keep in mind that their sizes affect cabinets. Communicate any appliance changes with your designer before ordering cabinets to confirm that they will fit with your final design.
Order Cabinets
After finalizing your kitchen design, you will order the cabinets. The lead time for cabinetry will vary depending on the cabinet manufacturer.
Order Complementary Products
With your cabinet selection complete, it’s time to shop for complementary products. This includes: flooring, hardware, countertops, lighting, sink, faucet and more.
Inspect and Store New Products
Prepare space in a garage or other dry area where you can inspect and store each new product. Many products, like wood cabinets and flooring, will need to be stored in a climate controlled area.
Remember that any special order products may require extra delivery time.
Establish a Temporary Kitchen
Before demolishing your current space, establish a temporary kitchen. For some, this may be as simple as a dorm-sized refrigerator and microwave. For others, an outdoor grill is the perfect solution.
Pack up Your Kitchen
Before the sledgehammers start swinging, you’ll need to pack up everything in your kitchen. If you haven’t already, this would be a good time to declutter your kitchen.
You may want to budget extra time and money for eating out more frequently during the rest of the project.
Be sure to leave out items you will need in your temporary kitchen.
Phase 3: Rough Construction (1-6 weeks)
Rough construction means demolishing the existing kitchen, building out structural features and framing the room. If you are keeping the same room footprint and appliance placement, this step could be completed in one week or less.
Demolish Your Kitchen (1 week)
After all new materials arrive and have been inspected, it is time to demolish your current kitchen. If you’re handling the demo yourself, have a plan for how to dispose of waste.
Make Structural Changes (2-4 weeks)
Make structural changes like new windows, walls or doorways now. DIYers should consult a professional to ensure that any structural changes, like removing walls, are done safely.
Before you begin demo, confirm that the gas, water and electric are off in the area you are working in.
Rough-in Plumbing, Mechanical and Electrical (3-5 days)
Most utility rough-in work needs to be completed before the drywall and flooring are installed. This gives access to the wiring for inspection and placing outlets, fixture boxes and switches.
Countertops cannot be fabricated before cabinets are installed. Be sure to schedule the measurements for after cabinets will be installed.
Install Drywall and Paint (1 week)
Hang and finish new drywall and insulation, if needed. Prep, prime and paint any surfaces that can be completed before installing flooring.
Install Flooring (2-3 days)
Many types of flooring, like tile and hardwood, should be installed before cabinetry. Some floating floor types, like luxury vinyl flooring and laminates, must be installed after the cabinets.
Utilities will need to be approved by a local building inspector before moving on to the next step. This will most likely take one week.
Phase 4: Finish Construction (1-2 months)
Finish construction is when all new products are installed in the kitchen. This is the final, and perhaps most satisfying, phase of the kitchen remodeling process.
Measure, Fabricate and Install Countertops (2-4 weeks)
Only after cabinets are installed, can measurements for countertops be taken. Fabrication, or making the countertop, can then take place. This can take up to one month depending on the material. The final step is installation.
Finishing Details and Hardware (1-2 weeks)
The finishing touches of the kitchen include cabinet hardware, crown molding, paint touch-ups and any other details. Level all appliances and check their connections.
Install Cabinets (3-5 days)
It is time to install the largest part of the kitchen, new cabinets.
Install Appliances and Fixtures (1-5 days)
Lighting is installed after countertops are added. Appliance and plumbing fixtures can also be installed at this time. Use caution moving heavy appliances so they do not ding or scratch new flooring and cabinets.
Install Backsplash (2-3 days)
Backsplash is the last major item to be installed. It usually takes two days, but could take longer if you’re creating a detailed design.
Clean the Construction Zone (1-2 days)
Cleaning includes: clearing the room and ventilation system of dust and debris, wiping down cabinets and scheduling haul-away of any garbage dumpsters.
If a building permit was required, schedule a final inspection by a building inspector. These take place during business hours.
Phase 5: Unpack and Enjoy!
Congratulations, your kitchen is brand new and fully functional! Unpack your items and find a new home for each one. You’re ready to show off your new kitchen!